ABB Peace Canyon

To accommodate the termination of the two new 500 kV transmission lines (5L005 and 5L006) Iconic Power Systems are constructing an extension of the GIS system and a 500 kV outdoor switchyard adjacent to the existing GIS building and switchyard. This includes installation of all steel, including equipment and bus support steel and terminal gantry structures for the termination of the final (slack) span of 500 kV overhead transmission conductor from each of the two new circuits; installation of all electrical work, including bus work, cables, signage, lighting, lightning protection and associated support structures; installation of grounding, including equipment grounding and bonding.