Conrad

The project scope for the Conrad substation includes installing a new transformer and switchgear and control building combo at Conrad 135s substation.

  • Add one (1) new 138/25kV LTC transformer having a minimum capacity of 25MVA
  • Add two (2) new 138kV breakers for the new and existing transformer
  • Add one (1) new 7- cell switchgear building with two new feeders
  • Salvage existing 25kV feeder