Enbridge, Line 3

Iconic Power Systems’ work associated with Enbridge’s Line 3 project is for the construction expansion of existing substations located at the Cactus Lake, Langbank, Glenboro, St. Leon and Gretna sites. The Work is defined to include all civil, structural steel, electrical, and instrumentation works in support of an expansion to an existing substation to convert 138kV primary power to 6.9kV secondary power. Iconic coordinated all third-party contractors including the early civil contractor, the general contractor, the transformer vendor, the circuit breaker vendor and the Substation Control Building (SCB) installation contractor.