Iconic’s scope of work for the ENMAX 16s substation consisted of the following:

  • Install 2x T-108A manholes with associated grounding
  • Install 1x15kV switch cubicle and associated grounding
  • Core 3x3 150mm ductbank into north wall of MH541. Reinforce as specified by civil inspection
  • Core 3x3 150mm ductbank into south wall of MH540. Reinforce as specified by civil inspection
  • Retrofit grounding in MH540 & MH541
  • Break into existing 2x4 ductbank and extend approx. 40m to MHbb
  • Trench & install approx. 127m of ductbank
  • Remove and replace existing substation fence as required
  • Hydrovac duct crossings and manhole walls as shown on drawing S01
  • Removal of trees as required and shown on drawings