Chestermere Point of Distributions (POD) - AltaLink

This AltaLink Chestemere substation was a full EPC greenfield substation project located on the south side of Chestemere Lake. This scope of work included all the engineering, the civil pad development and installing three 138 kV breakers and two 138/25 kV transformers along with a couple ABB Modular substation on skids.