ENMAX 11S

Iconic Power Systems will be adding new major equipment to the ENMAX 11 substation.  This work will include the installation of electrical equipment, concrete foundations, concrete cable trenches and low voltage bus connections to newly installed equipment. In addition to this scope, 11.83L will be swung over to the newly installed bay (north side) and the existing bay (south side) will be demo'd for future expansion.